Work package

WP 8 – Standardisation, Demonstration & Exploitation

Work package 8 deals with the standardization, implementation and exploitation of the project results. These are basically the technology, methods and tools, which are developed in the project.

Part of the WP is to provide standard evaluation method and criteria, means certification process which enables the proof of ADFs and EPS system according serial suitability. The results and gained knowledge over virtual and real testing will be used to specify standards considering existing standards and procedure of authorities for AD/ADAS system.

There are three aims in total for this work package:

  • The developed certification process draft shall be demonstrated in a large-scale demo between Austria and Hungary
  • The identified scenarios shall be orientated to the current regulation and standard developments.
  • These drafts shall be communicated afterwards to the relevant legal committees.

The WP has three tasks:

  • Task 8.1: Large Scale Demonstration
  • Task 8.2: Standardisation
  • Task 8.3: Exploitation as Business Cases